RAMS for small works: start with the actual job
A practical guide to preparing RAMS for small construction jobs when a client, site or main contractor asks for them before work starts.
Identify the task
Be specific about the activity, location, access, tools, materials and who is involved. Avoid using a broad document that does not match the job.
Check what the site requires
Clients, principal contractors and sites may have their own submission process, rules and lead times. Build those requirements into the review.
Use a meaningful foundation
A professionally developed editable template can provide relevant hazards, controls and method content to review rather than a blank page.
Tailor it before submission
Add real project details, workforce, sequence, interfaces and site arrangements. A template is a starting point, not an automatic approval.
Keep the final version clear
Make sure the people doing the work can understand the agreed method and the controls that apply to them.
Related RAMS and guides
Browse RAMS templates · Get the free editable sample · Read RAMS guides